While adding goals it would convenient to be able to directly link them to an existing release as opposed to going into the release detailed view and selected the goals in the goals field. Currently, the only way to link goals to a release is from the Release view (1 to many). The suggestion is to also be able to do this from the Objective detailed view (1 to 1).
Thank you for the idea. This is possible today by going to the Related tab of a goal. The status of this idea was out of date.