As a sw product manager in a 7.000 FTE company its highly important to be able to integrate between the two systems. The organization is about to start using Planview as our portfolio managment tool wheras our SW department have been using aha for...
Ability to tie color feature color to other fields
Status doesn't help to organize we would rather color code based on priority. We created a custom field for this and are eventually planning to use scorecards. We would like the ability to tie the color of the feature card to other fields beyond s...
Nick Galassi
almost 7 years ago
in Features
15
Future consideration
What is the challenge? Understanding why you are building something is key to doing it well. It's impossible to have all the data in one place (all the references might be there) and can be time consuming to read: Related: Ideas Features / require...
Mike Lowery
3 months ago
in
0
Future consideration
What is the challenge? Single columns and some swimlanes are not always enough to properly map the process we are following. What is the impact? Steps that the team would normally follow have to be hidden or made into requirements. Describe your i...
What is the challenge? I need to provide appropriate guidance material for the different score values in each scorecard metric. The only area to do this is the "Description" which manifests as a tooltip window. The window is fixed in size and if t...
Jon-Paul Ciambra
3 months ago
in Features
0
Future consideration
Allow user be be set to "default unassigned" using automation
What is the challenge? I want to remove me the PM from the assigned field once the work has been sent to my development team, so that the right person can assign themselves. What is the impact? I have to remember to remove me from the field. Descr...
Moving an idea between workspaces should not remove it from the portal
Sometimes, an idea is submitted to a portal that is mapped to a different workspace than the one that needs to respond. When moving the idea to the correct workspace, the link to the original submission is no longer valid and the submitting user e...
Gilly Dekel
almost 3 years ago
in Ideas
0
Future consideration
I'd like to be able to specify 20% contingency for a release. Meaning that if I have 100 points capacity, 20 of those points should be reserved for contingency / iteration (e.g. if doing Agile / Scrum). I'd like to see the contingency visually on ...
Elizabeth Karam
about 8 years ago
in Releases
1
Unlikely to implement
Limit "Capacity planning for teams" field on board to only teams with a value entered in the estimate
Who would benefit? Users creating advanced estimates and visualizing their teams on Feature/Epic cards when using default teams. What impact would it make? This would make it easier to quickly note which records are expected to be worked on by whi...
Maria Plotkina
12 months ago
in Capacity planning
0
Future consideration