I'd like to be able to specify 20% contingency for a release. Meaning that if I have 100 points capacity, 20 of those points should be reserved for contingency / iteration (e.g. if doing Agile / Scrum). I'd like to see the contingency visually on my capacity planning bars and how much contingency I'm creeping into. So I'd like to be able to fill the release with 96 points, but to see that I've already allocated out 16 of my contingency points, not leaving much room for iteration during the release.
Thank you for the idea. We currently do not have plans to update this area as it does not align with our current strategy or recent customer requests. However, it is currently possible for you to reduce the existing capacity manually by 20% and use the current reporting to show how much you have used your contingency.