Hi,
First, thank you! I really like how Aha! Breaks down strategy and quarterly goals into
I am Product Manager and a former Jira and Portfolio Jira users. I am use to
1. Laying out Epics and Features
2. Proritizing the Epics and Features
3. Working with teams or letting the teams break down Features and
a. Estimate Story points, if scrum
b. Put in avg throughput numbers, if Kanban
4. Putting Capacity/Throughput in for each team
5. Aligning teams to Epics and Features
6. Then the magic, of the dynamic roadmap gets generated (part 2 in link)
7. and being able to adjust based on scope, resources, timeline (part 3 in link)
https://www.atlassian.com/blog/jira-software/portfolio-for-jira-product-managers-edition
Is there a way to configure Aha! To build the dynamic roadmap?
We have Aha! Connected to TFS and the story points are being integrated so the “Features board” shows the capacity and “Capcity limit”, but to get to the roadmap I have to manually configure dates on the features, and tweak dates constantly to try to line up with the Capacity limit line.
Thanks,
Shawn
This will be a great feature in Aha! because it is quite complicated to manually modify the dates of each feature each time the roadmap is improved.