Skip to Main Content
ADD A NEW IDEA

All ideas

Showing 8642 of 8642

European standards for number formatting

Hello we have some worksheets we are using to input our KPIs.As we are a German company we use the European standards for number formatting which is dot for thousand separator and comma for decimals. Is there any way to have this a standard for ou...
Laura Chinellato over 2 years ago in  0 Future consideration

Rules based status changes on workflows

We need a feature that allows the Release status be automatically changed to a "red" or blocking status value based on a rule. An example for a rule would be: If Release date is < than Today AND Release status NOT Equal to Shipped than set Rel...
Christian Stark about 6 years ago in Releases 0 Future consideration

Alphabetize Products in Top Left Dropdown

It is difficult and awkward to quickly navigate to Products you are interested in because they are not sorted alphabetically. They appear to be sorted in the order they were created. Unless you remember the exact name and/or location of the Produc...
Guest about 6 years ago in Product 1 Future consideration

Add image to a presentation from a URL/URI

The ability to use URI based images allows us to easily update branding and styles without updating each presentation. HAving the same refresh options as Aha views such as manual or automatic refresh gives us some control. This is also necessary w...
Manesh Patel 9 months ago in Presentations 0 Future consideration

Edit Field Names in Pivot View

Can we edit field names when building a pivot table the same way we can edit them in List view? The List report builder has a lovely rename function that I use frequently when field names become long and cumbersome. However, when I build Pivot tab...
Guest over 1 year ago in Reports 0 Future consideration

Integrate Master Features and related features to different JIRA projects

In this scenario, there is one Program product workspace in Aha! and one Program project in JIRA which contains Master Features per Agile Release Train. All Stories (Aha Features) and sub-tasks (Aha Requirements) are with one or many Agile Teams (...
Guest over 4 years ago in Jira 1 Future consideration

Require approval for changes to certain fields

We would like to be able to 'lock down' some fields unless there is approval to change them. For example, Release date (or due date) Budget Designated people in the company would be required to approve any changes to these fields. Along with this,...
Kelly Sebes over 4 years ago in Releases 1 Future consideration

Include direct initiative link in export

It would be really nice to have the option to create an export with direct links items initiatives) that included a hyperlink back to the details page of the item. I have several reports that require an Aha export to be included with other materia...
Guest over 2 years ago in Application 4 Future consideration

Integrate analytics to features for success criteria tracking

We utilize Splunk to track client utilization of features. We track the impact of releases on DAU, MAU, and specific features - i.e. did this enhancement increase the utilization fo feature X. Would be great to have the feedback loop to developmen...
Guest about 9 years ago in Integrations 2 Future consideration

"Roll down" record view in reports - example, roll-down initiative

In a pivot report, I want to set the primary record as a higher level initiative in order to calaculate progress % complete at a strategic level (product line), yet pull in some artifacts like initiatives (product) and initiative % complete (produ...
CJ Jacobs almost 4 years ago in Reports 1 Future consideration