Need to be able to link initiatives so that I can connect them on timeline report view

I have initiatives that connect to one another in the same way epics can depend on one another. I'd like to connect them so that I can show them on the same row within an Aha timeline report.

  • Jaclyn Fine
  • Jul 1 2016
  • Shipped
Release time frame 3 months
  • Attach files