Allow Phases and Features and Milestones to be connected as dependencies
Merged
I was wondering if in the future it will be possible to connect phases and features as dependencies in the Release Roadmap? It's really the best view for achieving critical pathway within Sprints because of the dynamic dependency linking; the Features Roadmap feels limited, shows the exact same information as the Feature Board, and doesn't visualize order of attack. But not being able to visualize dependency connections in the Release Roadmap of phases like design iteration with timeboxed engineering efforts for features is requiring some workarounds like listing non-development tasks as features.
I'm finding I'm not using Phases at all now because they contain less information than a feature and because of the lack of dependency connection. If I could create a phase like "Example Feature Design Delivery" and connect it to Example Feature, that would be massively helpful because of the color contrast and staggered time boxing.
Being able to enable the visualization of Requirements as well would be huge, maybe as red bars linked to the features