Skip to Main Content
ADD A NEW IDEA

My votes: Reports

Showing 986 of 8737

Pivot changes - allow Total row and/or column

Currently with a Pivot chart you can choose to include a Total row AND column. For many pivot charts, only one of these makes sense and the other is useless space wasting data.
Greg Lyons about 3 years ago in Reports 3 Future consideration

Multiple record types in dependency report

I love the dependency report, but would love to be able to see multiple record types on either side of the report. For instance, a release might be blocked by a mixed set of master features and features, right now I can't see them all without clic...
Andy Nortrup over 4 years ago in Reports 2 Future consideration

Natural sort of status in idea report

Who would benefit? Anyone who needs to report the status of a large number of ideas (typically in preparation for meeting with a specific customer) and wants to make sure that things already implemented shows up at the top of the report to make su...
Guest 4 months ago in Reports 0 Already exists

Simplify navigation to My Reports

A small item but a constant irritant. I should be able to access the dashboard of reports with one click, but I have to click 'Roadmaps' (only some items under this tab are Roadmaps - which is additionally confusing) then move down to Overview, th...
charles bagnall about 5 years ago in Reports 5 Future consideration

use calculated columns of lists also for charts

Who would benefit? All people who must create sophisticated reports What impact would it make? Better reporting How should it work? Once created calculated columns for a list of records, it should be possible to use these calculated columns in cha...
Thomas Grill 4 months ago in Reports 0 Already exists

Share Report with individuals rather than with Products

Hi. Sharing Pivot Reports with members of a team working on the same product is fine, but in our organization, certain people work in more than one product, so we have special Pivot Report tracking specific issues to which need to share with these...
Guest almost 7 years ago in Reports 9 Unlikely to implement

User can view progress report "burndown chart" on a sub release timeline instead of the roll-up release date so the team can verify the progress for the month instead of quarter.

Assume each quarter is a roll-up release, for each roll-up there are multiple monthly sub release say month1-month3. As a user, I want to see the burndown chart for the sprint on a monthly basis so that I can correctly determine any over scoped ep...
Sampson Wong over 2 years ago in Reports 0 Future consideration

make Work Request responders available in reports of Workspace settings

I'm trying to create a report which shows who are set in the Work Request configuration to be notified for incoming Work Requests to that workspace. This field is not available in the Workspace Settings record when reporting. Please add it.
Jor Bratko about 1 year ago in Reports 0 Future consideration

Improved layout navigation for the Dashboard

Ability to move panels around more smoothly without them layering on top of each other or needed to be resized. Also being able to pop in panels where you want them versus dragging them from the bottom and rearranging everything to get them in the...
Fatimah Gorin over 3 years ago in Reports 2 Future consideration

Allow dashboard read only users to easily open the report behind the panel

When we create dashboards we set them as read only to avoid any unintended changes being made to them however the dashboards are designed to be used by users to trigger action, so they need to be able to easily get to the filter behind the panel. ...
Eamonn Corrigan over 2 years ago in Reports 1 Future consideration