Skip to Main Content
ADD A NEW IDEA

All ideas

Showing 8939 of 8939

Support advanced filtering on the workflow board

I want more control over filtering cards on the workflow board. For example, I'd like to be able to filter all of the cards based on the value of a custom field I've added.
Mark D over 3 years ago in Workflow boards 2 Future consideration

Allow presentation themes to be copied

Many times the user needs to modify the theme slightly for different audiences.
Keith Davenport almost 2 years ago in Presentations 0 Future consideration

Add "Align dates with children" to bulk edit

The new Gantt chart includes an option to align dates of parent records with their children. There are times when changes have been made to several records and those all need to have their dates re-aligned. It would be great if an option was added...
Austin Merritt over 4 years ago in Reports 3 Future consideration

Show inherited Competitors in Matrix view

We have been trying to position competitors on the “Competitor Matrix View” at product level. However we were expecting to see the competitors we have loaded in at the root product level line to add to the matrix. When the “competitor matrix view”...
Guest over 7 years ago in Strategy 2 Already exists

Enable Admins To Publish Reports

Administrators often manage Product Portals (because only admins can create new ones), and therefore it is limiting for admins to have to request from each report owner to update Share Settings. Admins should have ability to change all data settin...
Guest over 1 year ago in Application / Ideas portal 0 Future consideration

Lock status of parking lot items

It would be helpful to be able to lock the status of items within the parking lot to ensure agile capacity planning for team. This would align any items on the active board to the correct planning stage, and eliminate room for error within the par...
Annika Hudson almost 3 years ago in Capacity planning 0 Future consideration

Jira: import both time estimates and story points into Aha estimate field

We have multiple teams using Aha within a workspace. Some of these teams use Story points, other use time based estimates. While we can set the estimate type used per release within one workspace, we can't import story points into the Original Est...
Ate Fokkinga almost 3 years ago in Capacity planning 1 Future consideration

Moving a feature from the workflow board to the prioritized backlog should automatically unassign it

Who would benefit? All product and develop teams What impact would it make? Ensure the prioritized backlog is tidy How should it work? Moving a feature from the workflow board to the prioritized backlog should automatically unassign it
Nathaniel Collum 11 months ago in Application / Workflow boards 4 Future consideration

Dashboard grid spacing

The dashboard allows to arrange panels on the grid which is helpful, though the grid spacing can sometimes result in extra space. It would be helpful to minimize the space between panels but keep all data within the panel visible. This helps impro...
Craig Pflumm over 3 years ago in  0 Future consideration

Allow the JIRA integration to support mapping to more than one JIRA issue type and in Aha provide the ability to select the JIRA issue type to sync with

We use Aha for both Feature Requests and Defects and need to be able to designate if the JIRA issue type is an Epic, Story or Bug when linking to JIRA.
Kevin Konishi over 8 years ago in Jira 11 Already exists