I have Product initiatives that roll up to Line initiatives. When I convert a Product initiative to a master feature, the master feature loses the Line initiative, which then has to be manually added back. This will allow me to automatically keep that thread of strategy and eliminate the risk of master features being planned without a clear connection back to the plans.