We use initiatives at all levels within Aha and need to be able to integrate those with JIRA for additional capacity reporting. If initiatives are available to be entered on those levels, it would be useful to have the integration setup available as well.
Is there an ETA for this feature?
This is a needed feature, and to add, the start and end dates are also needed for the integration
The Jira integration needs to include portfolio fields as well as standard and custom Jira field mapping and it needs to be part of the Jira integration and mapping and not a separate integration