Skip to Main Content

Share your product feedback

Status Future consideration
Categories User story map
Created by Michael Scholze
Created on Dec 4, 2020

Allow to lock items when date is synched with integration

Currently when Epics, Features and Requirements use a Date Sync with our DevOps it would make sense to be able to lock the dates in UI and Bar-Lenght handles as they are exclusively coming from the external system. This would avoid:

  • A contributor accidentally dragging a bar's lenght to change a date, which could then accidentally back-sync.

  • The date field to become a "imaginary wishlist" how long feature implementation should take, as the team itself is providing those dates.

  • Prevent confusion when the sync is 1-way and shouldn't be changed thereafter.

  • Attach files