when we intergrate with Jira the Feature should pass to the epic its score.
since we only score the MF, the score should be reflceted on the F level as well.
or, allow a Feature to inherit the Master feature score (possibly upon a bulk update per release).
it should be the other way around IMO. the features under the master feature don't necessarily all have the same priority.