For the remaining estimate, after completing a feature, there are only current options to add it to the logged time or ignore it.
If I add it to the logged time, then it is deliberately falsified, because this time was never provided. Ignoring it results in a work remaining being displayed that no longer needs to be performed. So the release always shows a wrong total. To avoid this, the only option is to manually set the remaining estimate in the finished features to 0.
This could easily be solved by a third possibility in the settings, if you can select here that the remaining estimate should be set to 0.
That would really help out!