Skip to Main Content

Share your product feedback

ADD A NEW IDEA

My ideas: Epic

Showing 157

Allow different types of Master Features

We use Master Features a few different ways: A group of related features A use case that requires work (features) from different products. A feature that will be implemented in different products at different times (each of those would be a fea...
Julia Doyle over 5 years ago in Epic 1 Future consideration

Ability to sort epics on the gantt chart by something other than the four default options - specifically standard & custom fields

It would be beneficial to be able to sort the epics gantt chart by something other than the four default options. Specifically, a standard or custom field (and, ideally, also by the epic 'rank'). This will help: Ensure dates align with how things ...
Shannon Sauvé almost 4 years ago in Epic 1 Future consideration

Improvements for story maps with many features

Story maps are pretty much broken when you have a lot of features. A few things could make this easier: Enable a way to add an epic WITH its features; right now, I have to add an epic, remember what features it had and add it to a user story map E...
Nir Soffer about 4 years ago in Epic 2 Future consideration

Automatically populate Epic end/due date only when last feature is completed, instead of continuously

What is the challenge? Epic due date is updated continuously when underlying features are completed/done if due date is set to "Calculate from features". What is the impact? Gives a "false positive" indication of an epic's due date which in turn i...
Mats Hultgren 6 months ago in Epic 0 Future consideration

Initiative progress calculated from Epics completed

We are looking to create a progress bar for Initiatives based on Epics completed for each initiative. Currently, you can do that for epics by features completed. Our objective is to give an estimate of work done and work remaining without worrying...
Zayna Schaffer about 4 years ago in Epic 1 Future consideration

Ability to add timeframe to epics

Would like to leverage the administered time frame field that is managed in the account configuration for epics.
Guest over 4 years ago in Epic 2 Future consideration

Allow editing the layout of Related tab

In addition to being able to edit the layout of the Overview tab, it would be helpful to be able to specify what information shows on the Related tab. As an example, it would be good to see the sprint or story points associated with each feature i...
Lexy K over 1 year ago in Epic 0 Future consideration

Master epics should automatically inherit start and end dates from the release dates where the epics reside

With a master epic you can enter a start and end date, or have it be automatically calculated. The problem/idea is that this automatic calculation of start and end date should be based on the release dates for the releases in which the epics reside.
Guest over 3 years ago in Epic 2 Future consideration

Weigh epics based on story points for initiative progress

Not all of my epics under an initiative are equal size and Aha is considering them that way, which makes the progress inaccurate. For example, there are 5 epics under an initiative and Aha is treating them all as 20% of the Initiative. I want to t...
Guest about 1 year ago in Capacity planning / Epic 0 Future consideration

Configure so that epics and feature dates are following release dates

I would like to be able to configure so that the master features (MF) and features (F) follows the release date. This would be very helpful during sprint planning and replanning. The bulk editing is a work around, but still when you move around th...
Kristian Haglund over 5 years ago in Epic 1 Unlikely to implement