Skip to Main Content
ADD A NEW IDEA

Integrations

Showing 108

Disable Start date for Releases in integrations

When configuring a integration, in my case VSTS, Aha does not allow you to disable/delete the start date. Additionally, it only has a "one way" from Aha>Integration.
Guest almost 6 years ago in Integrations 0 Already exists

Capacity: how to populate from jira

I would like to know how the Original Estimate and Work Done fields are configured in Aha!. I have mapped (Jira)Total Story Points to (Aha!) Original Estimate and (Jira) Completed Story Points to (Aha!) Work Done. I'd like to know how to these pop...
Guest almost 6 years ago in Jira 0 Already exists

when syncing master features and linked features to VSTS, have relationship between these items persist on the VSTS Side

Here is issue: Create Epic in AHA Create Feature in AHA, linked to Epic above Sent Epic from AHA to VSTS Sending Epic to VSTS does also automatically send the Feature from AHA to VSTS. However, the Epic and Feature in VSTS are not linked.
Brian W about 6 years ago in Azure DevOps Services and Server 4 Already exists

Include Rally IDs in Master Feature Search criteria

On the Master Features Board page in Aha, there is a filter called "Master Feature Search" that I use to find a particular master feature very quickly. The Master Features show the Rally integration number (e.g. EP1234) but you cannot search on th...
Dan Eisenhut about 6 years ago in Rally 0 Already exists

Google Chat activities subscription - Product Line to capture all records of child products

As a user of google chat and the new Aha! integration. I want to select only the "product line" from the activities list and have all possible "records" of a child product captured within the product line, when a new record is submitted. e.g. Sel...
Guest about 6 years ago in Integrations 0 Already exists

Rally Integration options need "pull all fields"

When looking at the details of a feature or master feature under Integrations, there are options for "Delete Link" and "Resend All Fields". But what if the fields that need to be sync'd were changed on remote system (e.g. Rally) and I need to re-s...
Dan Eisenhut about 6 years ago in Rally 4 Already exists

Allow me to set up an account wide JIRA connection

We have several "products" in Aha and we have setup integration to JIRA on many of them. When our JIRA password changes, we have to visit each products settings page to update the JIRA connection. It would be nice if I could set up a JIRA connecti...
Guest over 6 years ago in Jira 1 Already exists

Need configuration to allow allow/block execution system (JIRA) initiated Epics back to Aha

For Epics which get initiated in Aha and flow down to JIRA, we want to enable 2-way integration so that updates which happen in JIRA are realized in Aha. However, if a NEW Epic is initiated on the JIRA side, we may not want that to be visible in A...
Guest over 6 years ago in Jira 1 Already exists

Automatically reduce feature estimate when requirement is completed

When using the requirements level estimates to drive the total estimate on the feature level we would like the feature level estimate to be reduced when a requirement is marked in a complete status. Also we would like to have the feature status au...
Guest over 6 years ago in Jira 0 Already exists

"Update JIRA" option for Requirements

If I update a Requirement after the Feature has been synced to JIRA, I want to be able to immediately have the corresponding Story in JIRA updated to match it. The synchronisation seems to take more than 10 minutes to go through. Like we have Acti...
Guest over 6 years ago in Jira 0 Already exists