Skip to Main Content

Share your product feedback

ADD A NEW IDEA

Jira

Showing 271

Need configuration to allow allow/block execution system (JIRA) initiated Epics back to Aha

For Epics which get initiated in Aha and flow down to JIRA, we want to enable 2-way integration so that updates which happen in JIRA are realized in Aha. However, if a NEW Epic is initiated on the JIRA side, we may not want that to be visible in A...
Guest over 7 years ago in Jira 1 Already exists

Automatically reduce feature estimate when requirement is completed

When using the requirements level estimates to drive the total estimate on the feature level we would like the feature level estimate to be reduced when a requirement is marked in a complete status. Also we would like to have the feature status au...
Guest over 7 years ago in Jira 0 Already exists

Import Feature Requirements from Jira 2.0

It would be helpful if Requirements were built out so that they can be imported from jira 2.0 AND moved from feature to feature as easily and features are moved betweeen master features.
Kaylee gervasi over 7 years ago in Jira 0 Already exists

"Update JIRA" option for Requirements

If I update a Requirement after the Feature has been synced to JIRA, I want to be able to immediately have the corresponding Story in JIRA updated to match it. The synchronisation seems to take more than 10 minutes to go through. Like we have Acti...
Guest almost 8 years ago in Jira 0 Already exists

Fix Time Tracking Totals when using Requirements

Currently: With the JIRA 1.0 integration. When using Requirements for Time Tracking the "Total Time" is not displaying the correct data. In Aha the Time Tracking says 73d 4h. Screenshot "Aha Time Tracking.png" In Jira the Time Tracking says 2w ...
Guest almost 8 years ago in Jira 1 Already exists

Manual selection of items selected for import from Jira

As a user of Aha! and Jira I want to be able to select the items that get imported from Jira so that I can more easily coordinate and synchronise the data held in the two products. There are two main tools that allow data to be brought into Aha! f...
Guest almost 8 years ago in Jira 0 Unlikely to implement

Set Dates of Feature Based on Status in JIRA

I'd like to see the Aha!/JIRA integration be updated to have an option to set dates of features (and possibly other items) based on Status that is in JIRA. Example: I create a Feature in Aha! and integrate/export to JIRA When Feature (referred t...
Aaron Kremin almost 8 years ago in Jira 0 Unlikely to implement

Integrations 2.0 - Only show valid integration directions for Release <-> Fix Version

Integrations 2.0 - Please only show valid integration directions for Release <-> Fix Version. I had opened ticket https://support.aha.io/hc/requests/176083 because I could not connect to the Jira version using Actions > "Link with existin...
Guest almost 8 years ago in Jira 0 Unlikely to implement

Integrations 2.0: Add dependency link to connect records without natural relationships together

In integrations 1.0 if I mapped Features = Story Requirement = Task Aha! would send the records to JIRA and create a "Relates to" dependency between the Story and the Task to visualize in JIRA that the two records should be related to each other. ...
Danny Archer almost 8 years ago in Dependencies / Jira 3 Future consideration

Jira 2.0: modify integrations based on templates

In 1.0, when using a template, you could choose what fields/behaviors to inherit from the template, and which to customize for that particular integration. This was useful for custom fields (now using a constant in 2.0) which will change from prod...
Max Cascone almost 8 years ago in Jira 6 Already exists