Skip to Main Content
ADD A NEW IDEA

Integrations

Showing 105

Include Rally IDs in Master Feature Search criteria

On the Master Features Board page in Aha, there is a filter called "Master Feature Search" that I use to find a particular master feature very quickly. The Master Features show the Rally integration number (e.g. EP1234) but you cannot search on th...
Dan Eisenhut almost 6 years ago in Rally 0 Already exists

Google Chat activities subscription - Product Line to capture all records of child products

As a user of google chat and the new Aha! integration. I want to select only the "product line" from the activities list and have all possible "records" of a child product captured within the product line, when a new record is submitted. e.g. Sel...
Guest almost 6 years ago in Integrations 0 Already exists

Rally Integration options need "pull all fields"

When looking at the details of a feature or master feature under Integrations, there are options for "Delete Link" and "Resend All Fields". But what if the fields that need to be sync'd were changed on remote system (e.g. Rally) and I need to re-s...
Dan Eisenhut almost 6 years ago in Rally 4 Already exists

Allow me to set up an account wide JIRA connection

We have several "products" in Aha and we have setup integration to JIRA on many of them. When our JIRA password changes, we have to visit each products settings page to update the JIRA connection. It would be nice if I could set up a JIRA connecti...
Guest about 6 years ago in Jira 1 Already exists

Need configuration to allow allow/block execution system (JIRA) initiated Epics back to Aha

For Epics which get initiated in Aha and flow down to JIRA, we want to enable 2-way integration so that updates which happen in JIRA are realized in Aha. However, if a NEW Epic is initiated on the JIRA side, we may not want that to be visible in A...
Guest about 6 years ago in Jira 1 Already exists

Automatically reduce feature estimate when requirement is completed

When using the requirements level estimates to drive the total estimate on the feature level we would like the feature level estimate to be reduced when a requirement is marked in a complete status. Also we would like to have the feature status au...
Guest about 6 years ago in Jira 0 Already exists

"Update JIRA" option for Requirements

If I update a Requirement after the Feature has been synced to JIRA, I want to be able to immediately have the corresponding Story in JIRA updated to match it. The synchronisation seems to take more than 10 minutes to go through. Like we have Acti...
Guest about 6 years ago in Jira 0 Already exists

Improve Slack to Aha integration to allow integration per product or for multiple Slack groups

The recent Slack to Aha integration is great but it can only be configured at the account level with one Slack group. This is very limiting and doesn't mirror the Aha to Slack integration which can be configured at the product level. For our mult...
Dave Tucker about 6 years ago in Integrations 1 Already exists

Fix Time Tracking Totals when using Requirements

Currently: With the JIRA 1.0 integration. When using Requirements for Time Tracking the "Total Time" is not displaying the correct data. In Aha the Time Tracking says 73d 4h. Screenshot "Aha Time Tracking.png" In Jira the Time Tracking says 2w ...
Guest about 6 years ago in Jira 1 Already exists

Active Directory or ADFS Integration

Our company is quite new to Aha. We really like the product but would like to make user provisioning and much easier. We use Active Directory for our employees like most all companies. I've looked and looked, but have only found integration throug...
Guest over 6 years ago in Integrations 1 Already exists